This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Canadian Pacific found guilty over NZ explosion death and injuries

10 December 2013

In a ruling on December 10, Auckland District Court said Canadian Pacific Limited (CPL), a specialist piping contractor, failed to ensure the safety of its employees. Canadian mother-of-two Philomen Gulland died in the blast in Onehunga on June 4 2011 while working for Watercare, an Auckland Council-controlled organisation.

Gulland's colleague, engineer Ian Winson, lost both his legs in the explosion and several other workers were injured.

Judge Rob Ronayne said CPL failed to identify the explosive gas hazard, carry out atmospheric testing and instruct employees to follow restricted-area procedures.

"Because the monitoring was never carried out it is impossible to come to any conclusion as to causation [of the explosion] and in any event I am not required to,." he said.

The company had pleaded not guilty in September to the two health and safety charges laid by the Department of Labour.

CPL was contracted by Watercare to repair a leaky valve chamber on a water pipe, taking advantage of the pipe being drained while Watercare was simultaneously upgrading the Auckland water system.

While the valve was being repaired, four Watercare inspectors, including Gulland and Winson, had entered a pipe 500 metres from where CPL was working. Their personal gas alarms sounded and the group exited the pipe and used a fan to ventilate it.

Gulland and Winson had just re-entered the pipe before the explosion. Gulland died at the scene.

The law did not require complete protection from harm but required all reasonably practicable steps to prevent the hazard. CPL had argued there was nothing that could have be done to avoid the harm to their employees or anyone else.

CPL will be sentenced at a later date.

Watercare Services Limited has already been convicted and sentenced in respect of the same incident. It was fined $81,000 and ordered to pay $315,000 in reparations to the victims of the blast.