This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Sponsored Article

Lewden Protects the Power at Hertfordshire University

09 September 2010

Lewden Electrical Industries was the preferred supplier when a bespoke feeder pillar distribution cabinet was required for a project at the University of Hertfordshire.

Lewden Protects the Power at Hertfordshire University
Lewden Protects the Power at Hertfordshire University

The installation, carried out by electrical/mechanical facilities company Neocrest, was to provide electrical power to student homes within the University Campus. As the original cast iron feeder pillars housing the cables had corroded severely over a period of years, this had caused earth continuity problems within the original installation.

By undertaking a prompt site visit, Lewden were able to meet with Neocrest and jointly assess and discuss the design requirements for the four new identical pillars. Subsequent drawing plans were provided by Lewden for the heavy duty galvanised steel cabinets, which enabled the project to gain the necessary approval and proceed quickly with manufacture.

The new pillars were also designed with consideration for possible future expansion, allowing the client the flexibility to accommodate further distribution equipment at a later date, quickly and easily, if required.

Commenting on the installation, John Sugden of Neocrest stated “Lewden were able to supply a custom designed product solution to meet both budget and project time constraints”.