This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Hima-Sella provides overpressure safety solutions for St. Fergus gas terminal

11 September 2012

Systems integration specialist Hima-Sella has been awarded and has commenced work on three contracts to provide solutions to protect against overpressure scenarios at the Total E&P UK Ltd gas terminal at St. Fergus, Scotland.

Under a contract awarded by Wood Group PSN, Hima-Sella is upgrading an existing Over Pressure Protection System (OPPS). The company is also contracted by valve manufacturer Mokveld to provide and install a new High Integrity Pressure Protection System (HIPPS) and a new Interlock Over Pressure Protection System (IOPPS).

Each system is being implemented using a Hima Planar 4 solid state logic solver connected to pressure transmitters fitted to the interlocking manifolds of the pipelines they protect. In the event of an overpressure scenario, the Planar 4 (which is SIL 4 capable) will send shutdown signals to the respective safety valves.

Hima-Sella is also providing a Hima HIMatrix system (itself SIL 3 rated) as a controller for ‘Sequence of Events’ reporting and pressure transmitter discrepancy calculations.

Eddy Turnock, Hima-Sella’s Sales & Marketing Director, comments: “These three projects reaffirm Hima-Sella’s position as a supplier of safety instrumented systems and professional engineering services into the oil and gas industry. In addition, the systems in question, and the way we design safety around safety critical infrastructure such as valves, provide the highest level of protection whilst affording operational efficiency.”

All essential system components have been delivered and are scheduled for installation during the summer. Commissioning is scheduled for mid- to late-September.

About Hima

Hima is the world’s leading specialist for safety-related automation solutions. Hima solutions provide maximum safety and maximum availability and can be integrated into any automation environment. More than 30,000 HIMA systems have been installed in over 80 countries, protecting the equipment of the world’s largest companies in the oil, gas, chemicals, pharmaceuticals and power generation industries for more than 40 years.

In the fields of rail, logistics and machine safety, Hima solutions are leading the way to increased safety and profitability. The Hima Lifecycle Services concept gives customers an overview of all the requirements of ‘functional safety’ allowing them to always make the right decision at the appropriate time.


Contact Details and Archive...

Print this page | E-mail this page